Glencore - Bulga Underground Operations

Installation of Gas Pipeline used for extraction of underground gas for the production of long wall mining. Works include polypipe welding, excavation and installation, drill pad and road construction. Pipeline extraction and site rehabilitation after long wall completion.

January, 2011 - Current
Rehabilitation

Bloomfield - Rix's Creek Mine Rehabilitaion

Open-Cut Mine Rehabilitation consisting of spreading of bio solids, gypsum and fertiliser, seed re-contouring and shaping of overburden batters, installation of sediment and run off drains, installation of rock drop structures, spreading of top soil, ground preparation, rock raking, ripping and soil turning.

2008 - Current
Rehabilitation